Dear Andrew,

 

I have few more query

 

A)   You can see in the screen shot we have two person “Hector” and “Stev” whose calendar we have displayed side by Side on Each Day

 

 

The functionality we need is we should be able to drag appointments into each other’s calendar.

 

In the XMASchedule component I know it possible to merge the calendars

 

What I want to ask is

 

1)    Is it possible to have a separate in (Like the line in above screen shot)  merge view to show different calendars

2)    Is it possible to drag appointment into each other’s calendar while we are into merge view?

3)    Also in the merge view when we have Appointment placed beside each other and when we resize one the smaller one docks to right. I.e. in the below screen shot appointment for user1 docked to right. Can we override this behavior?

 

Parents
  • 54937
    Offline posted

    saurabhd13 said:

    1)    Is it possible to have a separate in (Like the line in above screen shot)  merge view to show different calendars

    No currently the merged view mimics that of outlook where all the activities of the calendars in a group are arranged together within the timeslots of that group and distinguished by color coding.

     

    saurabhd13 said:

    2)    Is it possible to drag appointment into each other’s calendar while we are into merge view?

    Yes activity can be dragged between calendars by dragging an activity over the header of the calendar to which you want to add the activity which will then activate that calendar. That is how it works in Outlook. We provide some additional functionality in that you can still move it to another location in that same drag operation whereas in outlook it just changes the calendar but doesn't let you change the owning calendar and the start/end times in the same operation.

    saurabhd13 said:

    3)    Also in the merge view when we have Appointment placed beside each other and when we resize one the smaller one docks to right. I.e. in the below screen shot appointment for user1 docked to right. Can we override this behavior?

    No, the activity is positioned as it will be when the resize is complete and I believe our sorting is similar to that of outlook which considers the start time, end time, order of the calendar in the group and finally the subject.

    You should submit suggestions for any features that you would like to see added to the product.