Your Privacy Matters: We use our own and third-party cookies to improve your experience on our website. By continuing to use the website we understand that you accept their use. Cookie Policy
65
Upgrading project to latest infragistics controls giving design mode interface of old controls
posted

I have a project that was using Infragistics version 3.2.  I ran the project upgrade tool to upgrade it to 8.2.  When I drop a version 8.2 control from the toolbox onto a form, I get the design mode interface of the older controls.  How do I get it to give me the design mode interface of the new controls?

Parents
No Data
Reply
  • 65
    Verified Answer
    posted

    Though I used the upgrade tool to upgrade my WinForms project to the new Infragistics controls, that project was referencing our framework components which are still on Infragistics 2004.  I had to build my own version of our corporate framework using the new Infragistics libraries.  Once my solution was anything and everything Infragistics 2008 V2, I was working fine.

Children