Hi I am trying to plot a composite chart where in I have 3 layers of steparea chart to be plotted.
On the X axis I have time in hh:mm format and on both Y axis there is some numeric data to be plotted. In the attachment, I have provided the source code that I am using currently to plot the chart and also in an excel sheet I have provided the data and sample chart output.
However, I need your help to sort out on issue. As I mentioned earlier, on the X-asix I have time plotted in hh:mm format. In the data, the time is not continuous i.e the time duration from 11:00 am to 12:00 noon is missing (as per the requirements), but still on the chart I get to see the data points during this time. Is there a way to exclude this time range? Or rather is there a way to plot only the time values those are available in the data source.
Kindly help me to sort out this problem at the earliest.
Regards
Reena
so if i understand correctly, you want to change the way the blue area or "buy qty ratio" displays from 10:59 to 12:00.
but i don't understand what you want to see in its place. if you want the line to go back down to zero, then you would have to add a datapoint with value = 0 at 11:00.
Hi David,
As per the requirements for this chart, I simply dont want the time period between 11:00 am to 12 noon to appear on the chart. As per your suggestion, if I set the buy qty ratio to 0, the X-axis would still show the time range for that one hour, which is not desired.
Is it possible to simply hide the one hour duration on the chart?
oh, i understand now.
unfortunately, we don't have this feature (axis breaks) right now. you can submit a feature request here: http://devcenter.infragistics.com/protected/requestfeature.aspx
the best workaround i can think of is to create a line chart instead of a steplinechart. the downside of this is you need to add a datapoint for each minute, or each hour, you want represented on the chart - to simulate evenly spaced intervals of time.
Hmm... Anyways thanks for confirming that with current features of stepline chart or step area chart, I can not manipulate time values. I will put up a request.