Overlap
posted

Is there a way to make tasks not overlap? I have a GanttView with an interval of one month. If I have 2 tasks, one ending 02/15 and the other starting 02/16, the end and the start overlap for the whole month.

Parents
No Data
Reply
  • 69832
    Offline posted

    Currently tasks are aligned with the bounds of the time slots which contain the start/end times. If you like you can submit a feature request for the ability to change this and make the tasks offset their edges based on the amount of time between the task's start time and the start time of the first time slot with which it intersects.